CASE STUDIES
AEC
Hyperion Advanced Water Purification Facility
Facility, process and people, documented across two sessions a year apart.
DISCIPLINES
Architecture, Engineering & Construction
LOCATION
Los Angeles, CA
YEAR
2024 and 2025
SERVICES
Photography

02 Engineers on the process deck, June 2024.

02 Engineers on the process deck, June 2024.
01 Membrane treatment trains, shot wide to show the scale of the hall
CHAPTER 02
Engineering at a
human scale.
Complex infrastructure is easier to trust when you can see who runs it. We worked alongside the engineering team for the day, keeping people in frame wherever the architecture allowed.
02 Engineers on the process deck, June 2024.
CHAPTER 03
Returning a year
later.
A second session in July 2025 added operator portraits and lab detail, so the library now covers the facility from both sides: the infrastructure, and the people behind it.
03 Crew walking beneath the process canopy.

GALLERY
The selects.
10 frames · Click any frame to enlarge

GALLERY
PROJECT DETAILS
Behind the production.
SnapMotion photographed the Hyperion Advanced Water Purification Facility over two sessions. The brief balanced the architecture of the treatment halls with candid portraits of the engineers and operators who run them.
Location
Los Angeles, CA
Sessions
June 2024 · July 2025
Scope
Facility architecture, process detail and team portraits on site.
Deliverables
A curated image library for web, print and project reporting.
Approach
A small crew and available light, working around live operations with a minimal setup on the floor.
Creative Direction
Nathan Padilla Bowen
CONTACT
Let's make
something worth looking at.
SnapMotion Studio · San Diego, CA









