top of page

CASE STUDIES

AEC

Hyperion Advanced Water Purification Facility

Facility, process and people, documented across two sessions a year apart.

DISCIPLINES

Architecture, Engineering & Construction

LOCATION

Los Angeles, CA

YEAR

2024 and 2025

SERVICES

Photography

aec-15.jpg

02 Engineers on the process deck, June 2024.

aec-08.jpg

02 Engineers on the process deck, June 2024.

01 Membrane treatment trains, shot wide to show the scale of the hall

CHAPTER 02

Engineering at a
human scale.

Complex infrastructure is easier to trust when you can see who runs it. We worked alongside the engineering team for the day, keeping people in frame wherever the architecture allowed.

02 Engineers on the process deck, June 2024.

CHAPTER 03

Returning a year
later.

A second session in July 2025 added operator portraits and lab detail, so the library now covers the facility from both sides: the infrastructure, and the people behind it.

03 Crew walking beneath the process canopy.

aec-14.jpg

GALLERY

The selects.

10 frames · Click any frame to enlarge

GALLERY

PROJECT DETAILS

Behind the production.

SnapMotion photographed the Hyperion Advanced Water Purification Facility over two sessions. The brief balanced the architecture of the treatment halls with candid portraits of the engineers and operators who run them.

Location

Los Angeles, CA

Sessions

June 2024 · July 2025

Scope

Facility architecture, process detail and team portraits on site.

Deliverables

A curated image library for web, print and project reporting.

Approach

A small crew and available light, working around live operations with a minimal setup on the floor.

Creative Direction

Nathan Padilla Bowen

CONTACT

Let's make
something worth looking at.

hello@snapmotion.com

SnapMotion Studio · San Diego, CA

(619) 804-0863

Scope of Needs
Total Budget
bottom of page