top of page
logo.png

(619) 804-0863

Hyperion Advanced Water Purification Facility

Facility, process and people, documented across two sessions a year apart.

Case Studies

AEC

Engineers on the process deck, June 2024.

02

01

Engineering at a human scale.

Complex infrastructure is easier to trust when you can see who runs it. We worked alongside the engineering team for the day, keeping people in frame wherever the architecture allowed.

Membrane treatment trains, shot wide to show the scale of the hall.

01

CHAPTER 02

Returning a year later.

A second session in July 2025 added operator portraits and lab detail, so the library now covers the facility from both sides: the infrastructure, and the people behind it.

CHAPTER 03

03

Crew walking beneath the process canopy.

Let's make something worth looking at.

CONTACT

(619) 804-0863

SnapMotion Studio · San Diego, CA

PROJECT TYPE

STUDIOS

SNAP MOTION
 

© 2026 SnapMotion Studio
bottom of page